컨텐츠 바로가기
이곳에서 여러분의 꿈을 실현시켜 보세요. 도전과 변화를 선도하는 건축공학과

교수소개

건축공학과 이종식 교수
이종식
이종식
전화번호
062-360-5803
연 구 실
C동 607호
전자우편
jslee@songwon.ac.kr
연구분야
시공관리, 건설안전, 안전공학, BIM, VE
학력
  • 단국대학교 대학원 건축공학과 건축시공 및 관리, 공학박사
주요경력
  • 무영CM 기술연구소장
  • 단국대학교 건축공학과 연구전임강사
  • (사)한국건설VE연구원 부설 기술연구소 부소장
학회 및 협회 활동
  • Editorial Manager of Journal of Building Engineering
  • 現) 대한건축학회 광주전남지회 이사
  • 現) 한국건설관리학회 호남지회 이사
  • 現) 한국CM협회 건설VEㆍLCC위원회 전문위원
논문실적
  • 국제전문학술지(SCI급)
    • Risk Response Analysis Model for Construction Method Using the Forced-Decision Method and Binary Weighting Analysis, Journal of Asian Architecture and Building Engineering, Vol.8, No.2, 2009.
    • A Selection Model for Soil Retaining Walls in Construction Projects, Journal of Asian Architecture and Building Engineering, Vol.11, No.2, 2012.
    • A Numerical Value Evaluation Model for the Optimum Design Selection, Journal of Asian Architecture and Building Engineering, Vol.11, No.2, 2012.
    • Fundamental study on the development of forced carbonization reforming of low-quality recycled aggregates by using a nano-bubble method in Korea, International Journal of Applied Engineering Research, Vol.11, No.2, 2016. 
    • An Experimental Study on Lifting of Bridge Deck without Core Drill, Journal of Applied Engineering Research, Vol.12, No.3, 2017.
    • Analysis on the Degree of Risk According to the Causes of Accidents in Construction Projects in Korea, Journal of Applied Engineering Research, Vol.12, No.11, 2017.
    • Economic Feasibility of the Induction Heating Method for Dismantling Structures: Analysis of Reinforcement Recovery Costs based on Required Demolition Equipment, Journal of Applied Engineering Research, Vol.12, No.23, 2017.
    • Investigation of Practitioners’ Perceptions for Developing Building Information Modelling (BIM) - Based Value Analysis Model, International Journal of Civil Engineering and Technology, Vol.9, No.1, 2018.
    • Analysis Model of Cost-Effectiveness for Value Evaluation of Building Elements, Mathematical Problems in Engineering, Vol.2018, 2018.02
    • Numerical Model for CPTED Evaluation of Korean School Facilities Built before CPTED, International Journal of Civil Engineering and Technology, Vol.9, No.9, 2018.
    • ANALYSIS OF CO2 EMISSIONS DEPENDING ON THE USE OF HIGH-STRENGTH RE-BAR IN BUILDINGS. International Journal of Civil Engineering and Technology, Vol.9, No.9, 2018.
    • Selection Model of Construction Method Using Pair-wise Comparison Matrix, International Journal of Civil Engineering and Technology, Vol.9, No.11, 2018.
    • Comparison of High Strength Re-Bar Usage by Type of Building Structure In Korea, International Journal of Civil Engineering and Technology, Vol.10, Issue 04, 2019.
    • LCC Analysis Model of Building Material That Can be used in BIM Environment, International Journal of Civil Engineering and Technology, Vol.10, Issue 04, 2019.
    • Building Element Material Selection Model using Weighted Matrix, International Journal of Civil Engineering and Technology, Vol.10, Issue 05, 2019.
    • Risk Assessment of Major Work Type for Prevention of Accident Occurring at Construction Sites in Korea, International Journal of Engineering Research and Technology. Vol.12, No.9, 2019.
    • Safety Culture Evaluation Model at Construction Site, International Journal of Engineering Research and Technology, Vol.12, No.11, 2019.
    • Schedule Monitoring Method using LPS and LOB-Based Daily Work Report Model in Construction Project, International Journal of Advanced Research in Engineering and Technology, Vol.11, Issue 4, 2020.
    • Environmental Factors of Acceptance Organization Affecting Intention to Accept BIM, International Journal of Management, Vol.11, Issue 04, 2020.
    • Risk Analysis on the Causes of Safety Accident at Construction Site in Korea using Eigen-vector, Journal of Engineering and Applied Science, Vol.15, Issue 05, 2020.
    • Cost Evaluation Methodology That Can Be used In A 3D Architectural Design Environment, International Journal of Advanced Research in Engineering and Technology, Vol.11, Issue 5, 2020.
    • An Inference Method of Safety Accidents of Construction Workers According to The Risk Factor Reduction of The Bayesian Network Model in Linear Scheduling, International Journal of Management, Vol.11, Issue 7, 2020.
    • Appropriate Architectural Design Selection Model using Forced Decision Method, International Journal of Management, Vol.11, Issue 7, 2020.
    • Risk Analysis Model for Selecting of Soil Retaining Wall in Construction Projects, International Journal of Management, Vol.11, Issue 8, 2020.
    • Indexing Model Based on Vector Normalization Available for Value Engineering in Building Materials, Applied sciences, Vol.11, Issue 20, 2021.
  • 국내전문학술지(KCI급)
    • 중소규모 건축 및 엔지니어링 업역 간 협업설계를 위한 전문가 참여지원시스템 프로세스 구축, 대한건축학회논문집 계획계, Vol.25, No.6, 2009. 
    • 건설VE 최적대안 선정방법 및 의사결정지원 프로세스, 대한건축학회논문집 구조계, Vol.26, No.3, 2010.
    • CBR+GA모델을 활용한 물량기반 철근콘크리트 골조공사비 산정 시스템 개발, 대한건축학회논문집 구조계, Vol.26, No.3, 2010.
    • 적정 설계변경안 선정을 위한 의사결정지원 프로세스, 한국건설관리학회 논문집, Vol.11, No.2, 2010.
    • 사례분석에 의한 설계변경 지원프로세스 개선에 관한 연구, 대한건축학회논문집 계획계, Vol.26, No.10, 2010.
    • 주택재개발사업 기획단계에서 이용 가능한 수익성 예측 모델, 한국건설관리학회 논문집, Vol.14, No.1, 2013.
    • 사업초기단계에서의 건물에너지 사용량 및 비용 평가 모델, 대한건축학회논문집 구조계, Vol.29, No.8, 2013.
    • 정규화 기법 기반의 설계VE 기능 및 비용점수 산출 모델, 한국건설관리학회 논문집, Vol.16, No.4, 2015.
    • 내진 보강용 철근 사용 시 비용 절감 효과 분석을 위한 실증적 연구, 한국구조물진단유지관리공학회 논문집, Vol.20, No.4, 2016.
    • 다중 매트릭스 분석 기법을 이용한 최적 건축공법 선정 의사결정지원 모델, 한국건축시공학회지, Vol.16, No.4, 2016.
    • 내력벽식 아파트를 대상으로 한 고강도 철근 사용에 따른 철근량 비교, 대한건축학회연합논문집, Vol.18, No.5, 2016.
    • 복합 시설 프로젝트의 사업 가치 향상을 위한 리스크 관리 프로세스 구축 방안. 한국구조물진단유지관리공학회 논문집, Vol.22, No.1, 2018.
    • 프로젝트 참여자의 협력적 의사결정이 가능한 QFD 기반 VE 모델, 한국건설관리학회 논문집, Vol.20, No.4, 2019.
    • 건설현장의 안전문화 성숙도 평가에 관한 연구, 안전문화연구, 2021(12), 2021.

R&D 실적

  • 건설사업의 설계관리 개념과 기법, 산학협력
  • 건축 설계변경 관리를 위한 의사결정 지원 프로세스 모델 개발, 산학협력
  • 건축물의 에너지 사용에 대한 분석과 예측, 산학협력
  • 건축프로젝트 설계관리 체계 및 적용에 관한 연구, 산학협력
  • 건축프로젝트의 최적설계 대안평가를 위한 협력의사 결정지원 모델 및 시스템 구축, 한국연구재단
  • 노후 공동주택 구조 및 설비성능 개선 기술개발, 국토교통과학기술진흥원
  • 대형건설프로젝트의 원하도급 협력체계 극대화 연구, 산학협력
  • 리모델링 요소 기술 인력양성, 교육부
  • 발주자 요구사항 관리를 위한 BIM기반 공간/부위 DB구축 연구, 산학협력
  • 사례기반추론(CBR)에 의한 건축설계변경 관리시스템 개발, 교육부
  • 청사 적정공사비 산정시스템 개발, 한국건설교통기술평가원
  • 캄보디아 CM제도 개선을 위한 연구, 국토교통부
  • 효율적인 LCC 적용을 위한 기초자료 조사 및 분석, 산학협력
  • BIM 환경에서 활용할 수 있는 설계 객체 가치분석 모델, 교육부
  • 전일빌딩 리모델링 공사 설계의 경제성등 검토(VE), 광주광역시도시공사
  • 송파 ICT보안 클러스터 개발사업 공공기관 사업 예비타당성조사 기술성 검토 및 비용 추정, 한국개발연구원
  • 설계 객체의 공사기간 분석 및 시간 흐름에 따른 물리적 성능의 가치 변화 분석, 교육부
  • 인공지능 중심 산업융합 집적단지 공간건축 설계VE 용역, 광주광역시도시공사

수상이력

  • 2012 한국건설관리학회 정기학술대회 우수논문상, 한국건설관리학회
  • 2011 VE경진대회 우수상, (사)한국건설VE연구원
  • 2009 한국건설관리학회 정기학술대회 우수논문상, 한국건설관리학회
  • 2008 한국건설관리학회 정기학술대회 우수논문상, 한국건설관리학회
  • 2002 설계VE경진대회 입상, LH공사